Skip to main content
Boxplots
3. Describing Data Numerically / Boxplots / Problem 4
Problem 4

Use the following wait times (minutes) at 2:00 PM for the Space Mountain ride.
42 55 60 38 75 80 95 45 50 65 70 55\(\text{42 55 60 38 75 80 95 45 50 65 70 55}\)
Construct a boxplot.
Horizontal number line from 0 to 100 minutes labeled "Wait Time (min)" for constructing a boxplot.